Evaluate a proposed carton board substitution for a private label liner pack. Record affected features, trial evidence and the first order using the new board.

Identify exactly what the supplier wants to replace

The artwork for a panty liner dispenser carton has already been approved when the converter proposes a different folding board for the next order. The quoted weight per square metre is the same. The buyer still needs to know how a filled carton made from the proposed board will fold, close, print and dispense individual liners.

Open a change request under the existing pack reference. Ask the converter to name the current and proposed material grades, supply the relevant technical sheets and explain the reason for the substitution. Identify the parts of the order affected. In this case the request concerns the retail carton. The liner, release paper and individual wrap keep their own approved references.

Compare two filled packs against the agreed job

Ask for the existing pack and a trial made with the proposed board. Use the same liner count and stacking direction in both. If an unprinted trial is all that is available, it can answer questions about closure and dispensing. Reserve the print decision for a sample made with the proposed board, coating and finish.

Use a short comparison sheet at the review meeting. The example entries below illustrate observations a reviewer could record. Replace them with the actual references, observations and decisions from your trial.

FeatureAgreed referenceEvidence to record on the proposed pack
Carton blankBoard grade B07, cutting drawing D3New grade and drawing used for trial blanks
Tuck closureFlap remains engaged with the agreed fillPack count, filled orientation and any lifting at the corners
Dispenser openingTear strip follows the marked lineNumber opened, location of any tear into the printed face
Printed faceApproved colour sample on fileTrial print reference and buyer’s colour decision

Decide what the trial permits

Suppose two of ten trial cartons tear across the front panel when the strip is pulled. Photograph the location on each carton and keep a failed sample. Those observations give the converter a feature to correct. Record the count as two tears in ten trial openings. For a larger production check, agree the sample size, way of selecting cartons and acceptance criteria with the supplier.

Hold the carton change for the affected item and request another trial. If the converter adjusts the perforation, record the new drawing reference as a second change. Once the agreed opening and closure checks are satisfied on that revision, the buyer can approve those features. A colour decision still pending on the printed board remains a separate open item.

Set a cutover the packing team can recognise

At final approval, record the accepted board and drawing, the buyer’s signed print sample and the first purchase order permitted to use the new combination. Count the remaining old blanks and agree which order can consume them. If both revisions may appear in one delivery, tell the receiving team how the cartons will be distinguished.

Send the approved request to the buyer, converter and packing team. Retain one finished carton from each revision. When a retailer later reports a change in the way a pack opens, staff can match its order and packing record to the right physical reference.